ISO 9001:2015 Certified Factory | Quotes within 12 hours

Lianyungang Huaneng Power Auxiliary Equipment Co., Ltd. · ISO 9001:2015

Rotary Film Deaerator for Boiler Metallurgy

Rotary Film Deaerator for Boiler Metallurgy is one of our core products. From single replacement units to full power-plant retrofits, every rotary film deaerator for boiler metallurgy is designed, welded, assembled and pressure-tested in our own works in Lianyungang.

  • ✓ Quotation in 12 working hours
  • ✓ MOQ from 1 pc
  • ✓ DDP door-to-door
15+ years manufacturing 38 countries served 450 °C continuous flue gas duty <0.5 % leakage with sealing air 15–30 days standard lead time

Rotary Film Deaerator for Boiler Metallurgy engineered and fabricated in-house

Because design, cutting, welding, machining and assembly all happen in our Lianyungang works, rotary film deaerator for boiler metallurgy orders move from drawing approval to factory acceptance test without third-party handoffs — the stage where most delivery delays and leakage problems start.

What we deliver

  • Spray-tray or rotary-film internals engineered for stable oxygen removal across load swings
  • Sponge-iron media vessels with long-life filter material and simple replacement
  • Horizontal or vertical arrangement matched to the boiler house layout
  • Complete skid: vessel, internals, level control, safety valve and instrumentation
  • Factory acceptance test with leakage, torque and sealing-air reports for every unit

Technical specifications

Body materialMetallurgy (and 30+ certified grades)
ProductRotary Film Deaerator
Sealing classdissolved oxygen outlet below 0.03 mg/L (sponge-iron type) or 0.07 mg/L (spray-tray type)
MediaBoiler feedwater, industrial circulating water
TemperatureWorking pressure 0.02–0.6 MPa, saturated temperature duty
Size rangeCapacity from 2 t/h to 220 t/h per unit
ActuationElectric, pneumatic, electro-hydraulic or manual
StandardsISO 9001:2015, GB/DL/T design codes, third-party inspection on request

Why buyers choose Huaneng Power Auxiliary Equipment for rotary film deaerator for boiler metallurgy

We quote within 24 working hours, keep a dedicated engineer on every project and never subcontract the critical welding and machining. That is why most of our revenue comes from repeat orders and maintenance shutdown programs.

  1. 24-hour quotation: sizing calculation, sealing concept and actuator recommendation included.
  2. Leakage performance: dissolved oxygen outlet below 0.03 mg/L (sponge-iron type) or 0.07 mg/L (spray-tray type) verified by factory acceptance testing before shipment.
  3. Material traceability: mill certificates archived per heat number, retrievable for 5 years.
  4. Retrofit capability: units dimensioned from site drawings, templates or measured flange positions.
  5. Qualified supplier: approved by Sinopec, PetroChina, China Guodian, China Datang, CNOOC and Chalco.

Metallurgy applications

In metallurgy duty the rotary film deaerator for boiler metallurgy works continuous thermal deoxygenation of feedwater. We size the shaft, bearings and actuator for the actual dust load and temperature of the duct, not just the nominal cross-section, because a gate that jams during a shutdown trip costs far more than the difference in purchase price. Critical welds are inspected 100% on the first unit and by sampling (AQL 1.0) afterwards.

How the project runs

  1. Send your enquiry — duct dimensions, media and temperature, or drawings of the existing installation.
  2. Engineering review — sizing, sealing concept, material selection and actuator proposal within 24 hours.
  3. Quotation — itemized fabrication, actuation, sealing-air system and packing cost.
  4. Drawing approval — GA and detail drawings issued for your sign-off before production starts.
  5. Fabrication & FAT — cutting, welding, machining and assembly, then leakage and torque testing witnessed by you or SGS/BV.
  6. Shipping & support — seaworthy wooden cases, export documentation, installation and commissioning guidance on site.

Related capabilities

Buyers sourcing rotary film deaerator for boiler metallurgy usually also review our Rotary Film Deaerator capability, Metallurgy manufacturing solutions and request a quote. Full dimensional and material documentation is available on request.

FAQ

Questions about Rotary Film Deaerator for Boiler Metallurgy

What is the price of rotary film deaerator for boiler metallurgy?

Pricing depends on size, material and sealing class. Send us the duct dimensions, design temperature and pressure, and we will return a detailed quotation with material and fabrication cost breakdown within 24 hours. Replacement units for existing installations can be dimensioned from site drawings or photos.

What is the lead time for rotary film deaerator for boiler metallurgy?

Standard sizes ship in 20–30 working days after drawing approval; custom-engineered units typically need 25–35 days including internals fabrication. Worldwide export packing and shipping are available.

Can you match our existing installation?

Yes. Most of our output is retrofit work: we dimension flue gas dampers, slide gates and silencers from site drawings, templates or measured flange positions, and supply mating flanges, expansion joints and sealing-air systems to match.

Do you support metallurgy projects?

Yes. We supply metallurgy operators with rotary film deaerator for boiler metallurgy units tested for leakage, actuator torque and sealing-air pressure, complete with commissioning support and spare sealing parts. Our qualifications cover Sinopec, PetroChina, China Guodian, China Datang, CNOOC and Chalco supplier systems.

Ready to move your project forward?

Send duct data or drawings today — get an engineering review, itemized quotation and realistic lead time within 12 working hours.

WhatsApp